CONTACT 
CUSTOMER SERVICE  1-800-306-6333
or click to Email

Product Search:
 
Still can't find what you want?
Try our Extended Store

Wood Carpet Estimator

How much do you need? How to use this estimator:
1. Enter your square foot area here:   * There is a 20 cubic yard minimum Enter the area size in square feet.  Choose the depth you need then
2. multiply the number of yards by the prices listed below.  Remember, 

3. Suggested quantity of WOODCARPET® naturally compacted

the price does NOT include shipping.  Fill out the main form for a 

    12" deep = cubic yards minimum. 

free quote that does include shipping.
    10" deep = cubic yards minimum
      9" deep = cubic yards minimum Prices by material type:
      8" deep = cubic yards minimum Cedar .... $16.25 per cubic yard
      6" deep = cubic yards minimum Soft Wood .... $16.25 per cubic yard. Soft wood is a blend of woods
      4" deep = cubic yards minimum Recycled Wood Fiber .... $12.00 per cubic yard
      3" deep = cubic yards minimum  Cubic Yards x Price = $  
      2" deep = cubic yards minimum

4. Suggested quantity of DURALINER®

       1 layer  =  5' rolls

       2 layers = 5' rolls

5. Suggested quantity of DURADRAIN®

         (40in. x 87in.) panels 

6.

1. Playgroundsupplier  may assist, but it is not Playgroundsupplier's responsibility to calculate and order the correct quantity of product. This calculator is based on an average situation and using it will not guarantee sufficient quantities. This calculator has been provided to assist you in determining the quantity of products you may wish to order.
2. WOODCARPET® left to naturally compact may become accessible, however, for immediate or complete assurance of accessibility, WOODCARPET® must be installed, mechanically compacted, and maintained according to Playgroundsupplier's written recommendations and government guidelines. If WOODCARPET® is mechanically compacted, approximately 15% more WOODCARPET® will be required.
3. Bulk product quantity is calculated unsettled and non-compacted when it is loaded at the production facility. Settling will occur during shipping. Compaction will occur during and after installation.